Network Arch Bridge Project

Project Engineer: Mr. Ram Chandra

Project Status: Completed

Email Address: ram.chandra@cdcl.bt

Contact No.: +975-

Current Station: Samdrup Jongkhar, Bhutan

NETWORK ARCH BRIDGE PROJECT (SAMDRUPJONGKHAR)

RCC Network Bridge over Dungsumchu in Samdrupjongkhar as alternative route to connect main highway at 3km from Samdrupjongkhar town and below police check point (Pinchina) as well as connecting upper LAP of Samdrupjongkhar Throm. The bridge is designed by Bhutan Architectural Services and Infrastructure Consulting (BASIC) in joint venture with Design Planning & Management Consultants Ltd. (DPM) in Bangladesh. The execution of the project is awarded to CDCL on negotiated contract. The pre stress bridge of span 51.45m with 7mtr carriage width, footpath both side with viewing area. The bridge looks different from any other bridges in Bhutan with its Arch and bracing. The project start on 5th September 2016 with the execution period of 18 month and completion period is 5th March 2018.

NAME OF PROJECT Network Arch Bridge Project
PROJECT COST Nu.
FUNDING AGENCY Thromde Bridge project S/jongkhar
PERIOD START DATE September 2016
PERIOD COMPLETION DATE Octember 2018
PROJECT DURATION 30 Months
LOCATION Samdrup Jongkhar Thromde, Bhutan
NAME OF CLIENT Construction Development Corporation Ltd.